Minimum Distance in Feet From | Closed Portion of Treatment System (1) | Open Portion of Treatment System (2) |
Private water supply well | 50' | 100' |
Public water supply well | 200' | 200' |
Groundwater heat pump borehole | 50' | 100' |
Lake or reservoir | 50' | 100' |
Stream or pond | 25' | 25' |
Edge of drainage ditch | 10' | 10' |
Dwelling or other structure | 10' | 10' |
Property lines (unless a mutual easement is signed and recorded) | 10' | 10' |
Other type subsurface treatment system | 5' | 10' |
Water lines continually under pressure | 10' | 10' |
Suction water lines | 50' | 100' |
Foundation drains or subsurface tiles | 10' | 10' |
(1) Includes septic tanks, mechanical aeration tanks and impervious vault toilets. (2) Includes subsurface absorption systems, mound systems, intermittent sand filters, constructed wetlands or waste stabilization ponds. |
Sewer construction | Distance from well water supply | |
Private | Public | |
1. Schedule 40 plastic pipe with approved type joints or cast-iron soil pipe (extra heavy or centrifugally cast) with joints of preformed gaskets | 10 | 25 |
2. Sewer pipe installed to remain watertight and root-proof | 50 | 75 |
Min. Per inch | 2-bedroom 300 gal / day |
3-bedroom 450 gal / day |
4-bedroom 600 gal / day |
5-bedroom 750 gal / day |
6-bedroom 900 gal / day |
1 - 5 | 160 | 200 | 260 | 340 | 400 |
6 - 15 | 200 | 300 | 400 | 500 | 600 |
16 - 30 | 300 | 400 | 500 | 600 | 700 |
31 - 45 | 400 | 500 | 600 | 800 | 900 |
46 - 60 | 500 | 600 | 700 | 900 | 1,100 |
Depth of gravel | Reduction in trench |
12 | 20 % |
18 | 33 % |
24 | 40 % |
Percolation rate (min / inch) | Area / Bedroom (ft2) | Loading rate (gal / ft2 . day) |
1 - 5 | 300 | 0.500 |
6 - 15 | 400 | 0.375 |
16 - 30 | 600 | 0.250 |
Percolation rate (min / inches) |
Design hydraulic loading (gpd / ft2) |
Length of drip line (feet / bedroom) |
1 - 5 | 2.0 | 40 |
6 - 15 | 1.3 | 60 |
16 - 30 | 0.9 | 90 |
31 - 45 | 0.6 | 150 |
46 - 60 | 0.4 | 200 |
61 - 90 | 0.2 | 400 |
91 - 120 | 0.1 | 800 |