This illustration shows the use case diagram, Alter a Propagation Schedule in the AQ Administrative Interface.
To alter a propagation schedule, you must name the source queue. You must also name the destination as local database (default is NULL), or name the destination as remote database. You must also continue until unschedule (the default for duration), or specify the duration in seconds.
Additionally, you must don't repeat (default for next time is null), or repeat as specified. Further, you must recheck every 60 seconds (default for latency), or specify the recheck interval.