General Principles of Pumping Station Design and Layout - 01...
Chapter - 01 : Introduction...
1-1. Purpose and Scope...
This manual provides guidance for the design and layout of civil works pumping stations used for removal of interior
drainage from areas protected by local flood protection works and for water supply. The discussion presented in this manual
is general in nature. The development of detailed design criteria is presented in other manuals referenced herein. This
manual is for the guidance of Corps of Engineers personnel engaged in the design of flood protection projects.
1-2. Applicability...
This manual applies to all HQUSACE elements, major subordinate commands, districts, laboratories, and field operating
activities having civil works responsibilities.
1-3. References...
( a ) CFR, Section 208-10, Title 33.
( b ) ER 1110-2-109 Hydroelectric Design Center.
( c ) ER 1110-2-401 Operation, Maintenance, Repair, Replacement, and Rehabilitation Manual For Projects and Separable
Elements Managed by Project Sponsors.
( d ) ER 1165-2-131 Local Cooperation Agreements for New Start Construction Projects.
( e ) EM 385-1-1 Safety and Health Requirements Manual.
( f ) EM 1110-2-1413 Hydrologic Analysis of Interior Areas.
( g ) EM 1110-2-1913 Design and Construction of Levees.
( h ) EM 1110-2-3104 Structural and Architectural Design of Pumping Stations.
( i ) EM 1110-2-3105 Mechanical and Electrical Design of Pumping Stations.
( j ) NFPA 10 Standard for Portable Fire Extinguishers.
( k ) NFPA 37 Stationary Combustion Engines and Gas Turbines.
( l ) NFPA 101 Life Safety Code.
1-4. Plates...
Plates 1 through 12 in Appendix A show different types of pumping stations constructed by the Corps of Engineers. A short
description of each pumping station is also provided.
1-5. General...
( a ) Dependability.
Pumping stations are one of the more vulnerable features of a flood protection project. The failure of a pumping station
during a flood could result in considerable damage within the protected area. This would cause the loss of some or all of
the benefits that justified construction of the project. Consequently, station dependability must be the primary
consideration, during the design and pump selection process.
( b ) Economics.
While the cost of the pumping station is generally but a small percentage of the cost of the entire project, this does not
mean that the designer is to proceed without any consideration of cost. Because of the infrequent operation of the majority
of local flood protection pumping stations, efficiency can be sacrificed to a certain extent in favor of equipment with a
lower first cost. However, higher pump efficiencies can actually lower the installed horsepower requirements and reduce
operating costs for large stations that have frequent usage. The extra costs to provide higher efficiency equipment should
be studied on a life cycle cost basis over the project life. This economic study should consider both first cost and the
cost of operation, maintenance, and replacement of equipment over the project life.
( c ) Refinements.
The equipment selected must be rugged, reliable, and well suited for the required type of service. The pumping station
structure should be sized to house and support the equipment. Refinements which make no realistic contribution to usability
or dependability should be strictly avoided. Architectural appearance will not be a governing criterion except in highly
developed areas where concessions in regard to exterior treatment may be made as discussed in EM 1110-2-3104.
( d ) Large stations.
In the design of some stations an unusual combination of conditions may be encountered which will require special treatment.
This will frequently be the case for exceptionally large stations. However, the fundamental principles, criteria, and
policies provided herein are applicable to all stations. Stations having a capacity of 30 cu m/sec (1,060 cu ft/sec) or
larger will be engineered by the Hydroelectric Design Center (HDC) in accordance with ER 1110-2-109.
1-6. Local Cooperation...
( a ) General.
Project cooperation agreements (PCAs) are prepared by the project management office in accordance with ER 1165-2-131.
Engineers responsible for the preliminary design and layout of the pumping facility should coordinate any special design
features that may affect the local sponsor’s costs with the project manager.
( b ) Maintenance and operation.
A project’s Operation and maintenance manual will outline the responsibilities of the project sponsor for the operation,
maintenance, repair, replacement, and rehabilitaion (OMRR&R) of all project features. Instructions for the preparation of
operation and maintenance manuals are provided in ER 1110-2-401. Development of the pumping station feature of the manual
is contained in EM 1110-2-3105.